• 93 183 08 00 - 91 048 43 70
  • bee-solution@bee-solution.net

Optimization of the cost of the term of electrical energy power

Initial situation

The Covid-19 promotes a new law allows temporarily adjusting the contracted power.

Our performance

We have focused on the Medium Voltage points, regardless of the sector and the variability of its production.

We have reduced the power of periods P1 to P4 to a minimum during the months of April and May, to take advantage of the fact that in these months only the power of P5 and P6 is recorded.

Results

Savings of 78,4% in the term of power, which has resulted in 40,8% in the total energy bill of our Clients.